Development Features
2845 Residential Stands
Stands sizes vary from 180m2 to 600m2 on good soils , with very good views and perpetual mountainous breeze
26KM Roads Network
26 000m quality roads network with widths varying from 12M to 20m giving unfettered access to all stands
Water Supply
20 boreholes strategical sunk and pumping into reservoir tanks to supply water to each and every stand
Sewer Services
Sewer Lines to each and every stand. Sewer pump station on site away from stands feeding into an already existing sewer line
Educations Facilities
The development has 10 stands for creches , primary, secondary and a college for servicing the community and Mutare at large .
Commercial Facilities
The development boasts 37 Shops and 25 Industrial Stands for easy of shopping SME industrial work places.
10KM From Mutare CBD
The development is 10km from Mutare CBD and accessible via Dangamvura road or via Masvingo Road
Religious Places
8 stands are designated for construction of places of worship including churches and Mosques
Fuel Station
One fuel station to service the development and neighboring developments
student accommodation
Location suitable for student accommodation due to close proximity to Manicaland State University and Mutare Teachers College
ELECTRICITY
Electricity source available within the development with capacity to connect to all stands within the development .
recreational parks
Over 40 hactres of open spaces for use as recreational parks among other uses.
PATH TO COMPLIANCE
development permit
Permit issued in October 2019
pegging
All stands were pegged by December 2019 with stand numbers on ground.
DISPENSATION CERTIFICATES
Pegging and Survey work submitted to Surveyor General Office and Dispensation certificates issued.
EIA Certification (EMA)
EIA certificate was issued on 22 June 2020
ENGINEERING DRAWINGS
Engineering drawings for roads water and sewer done and submitted to Mutare City Council.
council approvals & permit
Mutare City Council approved all engineering drawings and issued a permit for the civil works to commence
CIVIL WORKS
Civil works commenced in August 2020 with opening of roads for phase one of the development
phase one compliance target
Phase one consisting of one 500 residential stands is on track to be compliant June 2022